Service

How to quote a change order so it does not feel like a bait and switch

The one that went sideways

A client asked me to add two speakers on a patio. Easy work. I said sure, we can do that, and my guys did it that week.

Then the bill went out. Speakers, amp channel, wire, labor, a trip charge. It was a fair number. It was also the first number he had ever seen.

He was furious. Not about the money. He had said "sure, add it" thinking it was small. Then he got a real invoice.

He paid it. He never called me again. That one is on me.

The rule I follow now

Nothing gets added to a job until the client has seen a number and said yes to that number.

Not a range. Not "a few hundred". A number, in writing, before we touch it.

This slows me down by about ten minutes. It has never once cost me a change order. Clients who want the work still want it after they see the price.

What goes in the change order

Keep it short. Four parts.

What they asked for, in their words. Start with their sentence. "You asked about music on the back patio." Now they know you listened, and they can tell right away if you understood.

What that actually takes. Plain language, no part numbers unless they want them. "Two speakers in the patio ceiling. New channels in the rack, and wire out to the patio. Then the programming to add it to the app."

The number. One number, big enough to see. If you break it out, break it into no more than three lines. Long itemized lists invite line by line arguments about your labor rate.

What it does to the schedule. This is the part most of us skip and it is the part clients care about most. Say whether it moves the finish date. If it does not, say that too.

Then one line at the bottom: reply yes and we will schedule it.

Explain why it costs what it costs

Most sticker shock comes from a client picturing the wrong job.

They picture two speakers. You are doing a rack change, an attic crawl, an outdoor rated run, a trim visit and programming. Those are not the same job, and they have no way to know that unless you tell them.

One sentence does it. "The speakers are the small part. Most of this is the run out to the patio, and the setup in the app."

Now the number makes sense. People will pay for work they can picture.

Do not hide the trip

If a change needs its own visit, say so and charge for it plainly.

Burying a trip inside a part price feels sneaky when the client eventually notices. Naming it feels normal. Everybody understands that a truck showing up costs something.

The exception is when you can fold it into a visit you were already making. Do that whenever you can, and tell them you did. That is a small kindness they will remember.

Timing matters more than wording

The best time to quote a change is the same day it comes up. Not the end of the week.

The client asks in the moment, when they are excited about the idea. If your number lands while they still want it, they say yes. If it lands nine days later, the excitement is gone and now it just looks like a bill.

Same day is why I automated mine. Writing change orders by hand at the end of a long day is the thing that slips. So TrimOut builds it off the existing job. I read it, fix it, and send it before I leave the driveway.

The awkward one: work you should have caught

Sometimes the change is really a miss on your side. Something you should have included and did not.

Say it. "We missed this in the original scope. Here is the cost of the parts. We are not charging labor on it."

Eat something on it. Not everything, unless it was truly your error. Clients forgive a dealer who names his own miss. They do not forgive one who slides it onto the invoice.

The test

Before I send a change order I read it and ask one thing. If I got this, would I feel handled or informed?

Handled means it reads like a sales move. Informed means it reads like somebody telling me what I asked for, what it takes, and what it costs.

If it reads like the first one, I cut the adjectives and put the number higher on the page. It is amazing how much friendlier a document gets when the price is easy to find.

Run your next job through it.

Bring a proposal, or bring a walk-through.

Let's get started